Commissioning Manager - Data Center Construction
Company: The Weitz Company / Contrack Watts, Inc.
Location: Milwaukee
Posted on: February 16, 2026
|
|
|
Job Description:
Job Description Job Description Salary: The Weitz Company is
hiring a Commissioning Manager to be located on our data center
projects for the Mission Critical Business Unit in Port Washington,
Wisconsin. The Commissioning Manager is responsible for managing an
assigned scope of the commissioning process, to include ensuring
correct installation and functionality of equipment, systems and
facilities. This role will collaborate, provide guidance and
facilitate training needs to internal and external operations staff
during the commissioning process. The Commissioning Manager
typically reports to the Sr. Commissioning Manager. The Weitz
Company has been Building a Better Way since 1855. We are a
full-service construction company, general contractor,
design-builder, and construction manager with office locations
throughout the United States. We believe our employees to be our
most valuable asset, and we are committed to growing a diverse and
inclusive culture that inspires, motivates, and continuously
improves. What Youll Do: Manage assigned scope(s) of the
commissioning process (level 1 - 5), to include development and
execution of plans and schedules; coordinate efforts with
contractors and project team members; write and negotiate
subcontracts Lead regular project meetings (i.e. commissioning,
OAC); set project team expectations and coordinate trade partner
schedules; provide updates and escalate potential risk areas to
management Manage the weekly work plan by providing project
progress reports to management, to include scope, schedule and
budget status Ensure commissioning processes meet quality
standards, schedule requirements and customer expectations Conduct
submittal and commissioning design, drawing and specification
reviews Develop start-up and test forms, functional test scripts
and integrated systems test scripts; audit and approve execution
Manage project closeout process, to include turnover of operations
and maintenance manual(s), model turnover and training of the level
5 process Collaborate with project safety, engineering, quality
control and other project teams and trade partners to review
project schedule, commissioning scripts and identify and solution
any schedule or cost barriers; escalate to management as necessary
Identify and troubleshoot system installation and operation issues;
coordinate with stakeholders to determine a resolution; escalate to
management as necessary Review NETA and thermal imaging test
documentation Create and understand project energization and load
banking plan Lead level 3 testing on individual devices, including
temperature and humidity sensors, damper actuators, differential
pressure sensors, variable frequency drive (VFD), variable air
volume (VAV) and energy conservation measures (ECM) Assist
third-party clients with level 4 functionality testing of
electrical power management system (EPMS) and building management
system (BMS) equipment on site Create pre-commissioning equipment
checklists to verify proper installation, system performance and
compliance requirements in accordance with project plans and
specifications Perform integrated systems testing (IST) and
handover phases without error Manage dispute resolution among
subcontractors, vendors, architects and owners, within delegated
authority Identify and propose value engineering and scope
reduction opportunities Mentor and create development goals for
team members, including delegation of tasks/responsibilities for
development What Were Looking For: Experience: A minimum of five
(5) years of construction project management, mechanical and/or
electrical experience is required, to include a minimum of three
(3) years of HVAC, fire protection, control systems and/or
electrical testing experience. Data center commissioning experience
with hyper-scale clients Proven history of leading others
successfully and to teach, develop and mentor others. A basic
understanding of construction law, generally accepted business
practices and LEAN principles experience is desirable. OSHA 10 or
30 preferred, or the willingness to obtain upon hire. Skills:
Excellent leadership skills with a desire to mentor, coach, and
develop a team Strong problem-solving, negotiation, analytical, and
project management skills Excellent verbal and written
communication Detail-oriented and highly organized Strong
negotiation skills Strong technical understanding of electrical
equipment/systems inspections, testing, and related commissioning
activities Technology: Candidate should have experience with
Microsoft Office Suite, and have the ability to learn specific
software. Solid systems experience with Procore, JDE, Bluebeam, and
scheduling software. Training will be provided on company
standards. What We Offer: Competitive Pay Rewarding Bonus Program
Comprehensive Benefits Package with Tax-Advantaged HSA and FSA
offerings Employer-Paid Short- and Long-Term Disability Programs
Employer-Paid Life Insurance Generous Paid Time Off Provisions 401K
Retirement Savings Plan with Company Match Tuition Reimbursement
Fully Paid Parental Leave Voluntary Products Including: Critical
Illness Insurance and Accident Insurance Corporate Wellness Program
with Wellness Time Off and Rewards Visa sponsorship is not
available for this position at this time. The Company does not
accept unsolicited resumes from search firms or agencies. Any
resume submitted to any employee of the Company without a prior
written search agreement will be considered unsolicited and the
property of the Company. Please, no phone calls or emails. The
Weitz Company, LLC (and its U.S.-basedsubsidiaries and affiliates)
recognizes the value of and is committed to hiring and retaining a
diverse and inclusive workforce.We are an Equal Opportunity
Employer and follow applicable affirmative action guidelines and
policies. All qualified applicantswill receive consideration for
employment (including minorities, females, veterans, and
individuals with disabilities, regardless of sexual orientation,
gender identity, or other protected categories in accordance with
applicablestate and federal laws). The Company is a drug and
alcohol-free workplace and background checks are required if
applicable.Click hereto review our Privacy Notice. LI-KR1
Keywords: The Weitz Company / Contrack Watts, Inc., Evanston , Commissioning Manager - Data Center Construction, Engineering , Milwaukee, Illinois